Skip to content
A data center technician with a laptop in front of a long row of server racks

Infrastructure Services

Rack and Stack Services

STEM Global's data center technicians receive, unbox and rack your hardware to your elevations, then cable, label, dress and power it up so your team can take it from there. One rack or a full hall, the crew travels to your site.

What's included

Rack & Stack, start to finish.

  • 01

    Receiving, inventory and unboxing

  • 02

    Racking to your rack elevations

  • 03

    Power and data cabling, dressed and labeled

  • 04

    Power-on checks and asset reporting

What you get

  • Hardware installed correctly the first time
  • Every device and cable labeled and recorded
  • A crew that scales from one rack to a full hall

How we approach it

STEM Global's technicians confirm elevations, power and cabling plans before the trucks arrive, then receive, inventory and stage every device. Hardware is racked, cabled and labeled to your standards, powered up and checked, and you get an asset report showing exactly what went where.

Who does the work: Data center technicians who travel to your site, with on-call specialists to scale up large deployments.

Why STEM Global

One partner for Rack & Stack, from plan to everyday running.

  • One partner, start to finishSTEM Global advises, implements and then runs what it builds. There's no handover gap between a consultancy, an integrator and a support vendor.

  • The people who do the workYour project is staffed by the developers, consultants and engineers who do the work, including CCIE- and CCNP-certified network engineers.

  • Built to be runEverything is documented, tested and handed over with runbooks, because STEM Global often runs it afterwards too.

How we deliver

From discovery to managed services.

  1. 01

    Discover

    STEM Global learns your goals, systems and constraints, and agrees scope, timeline and success measures.

  2. 02

    Design

    Architecture, configuration and migration plans, reviewed with your team before anything changes.

  3. 03

    Implement

    We build, configure, integrate, migrate and test, then cut over with a rollback plan ready.

  4. 04

    Run

    After go-live we support, monitor and improve it as your managed services provider.

Have a project coming up?

Schedule a Technical Strategy Call